General plan of improvements and extensions to the original Cairo main drainage works.

Saved in:

Corporate Author: Egypt. Wizārat al-Ashghāl al-ʻUmūmīyah

Format: Map Book

Language: English

Subjects:

Tags: Add Tag

No Tags, Be the first to tag this record!

Call Number: M208 / EAP

LEADER 01419nem a22003615a 4500
001 11720
003 OSt
005 20210308085511.0
008 130303s1929 ua b g 000 0 eng d
952 |0 0  |1 0  |2 lcc  |4 0  |6 M0208 / EAP  |7 1  |9 10906  |a ARCE  |b ARCE  |d 2021-03-08  |l 0  |o M208 / EAP  |r 2021-03-08 00:00:00  |w 2021-03-08  |y MP 
999 |c 19850  |d 19850 
035 |a map00000062 
040 |c ARCE Library 
043 |a f-ua--- 
050 0 4 |a M208 / EAP 
110 1 |6 880-01  |a Egypt.  |b Wizārat al-Ashghāl al-ʻUmūmīyah, 
245 1 0 |a General plan of improvements and extensions to the original Cairo main drainage works. 
246 3 |a Survey of Egypt 
255 |a Scale 1:50,000. 
264 1 |a Cairo :  |b Government Press,  |c 1929. 
300 |a 1 map on 1 sheet :  |b color ;  |c 44.5 x 67 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a This map is based on the map of Cairo produced by the Survey of Egypt. 
506 |a May require conservation work before use. 
651 0 |a Cairo (Egypt)  |v Maps. 
880 1 |6 110-01/(3/r  |a مصر.‪‪‪‪‪‪‪‪‪  |b وزارة الأشغال العمومية.‪‪‪‪‪‪‪‪‪ 
901 |a reviewed 
942 |c MP  |2 lcc 
945 |a M208 / EAP  |g 1  |i 291579-dr  |l 1arce  |o z  |p $0.00  |q    |r    |s w  |t 0  |u 0  |v 0  |w 0  |x 0  |y .i31602721  |z 02-04-08 
949 |a M208 / EAP  |a pl. 1  |c arcesim 
998 |b 01-30-08  |c m  |d -  |i 1